
Vacant Land opportunity
TWP 360 RR 283C
Live Commercial Inventory
75 active development land listings currently returned by the authorized Alberta commercial feed.
Current page scope
This page includes records whose feed fields identify the property type as Vacant Land, the locality as Red Deer, and the province as Alberta. Commercially presents the public market name as Red Deer. It does not represent completed sales, vacancy, absorption or valuation evidence.

TWP 360 RR 283C

Off Range Road 281 & Township Road 383A

342 Energy Way

345 Liberty Avenue

3 McKenzie Drive

132 & 138 Clearmile Avenue
Evaluation Framework
Listing data begins the review. Intended use, physical condition, approvals and commercial terms require independent verification.
Red Deer decision context
Red Deer commercial property decisions should begin with the current parcel record and the buyer's or tenant's exact operation. Industrial, office, retail, land and multifamily listings can carry different zoning, access, utility, building, parking and change-of-use requirements even within the same market.
Red Deer adopted Zoning Bylaw 3357/2024 in May 2024. The City explains that the bylaw's text regulates each zone and its maps identify the zone applied to each parcel; permitted, conditional and prohibited uses must be read from the current record.
For development land property, apply this municipal record to planning policy, permitted density, servicing capacity, approval pathway. Each conclusion remains parcel- and use-specific.
Municipal verification
Confirm each item against the current official record and qualified professional work.
Identify the parcel in the City's current map and use Bylaw 3357/2024, not a superseded district label from an old brochure or report. Confirm the proposed use, site regulations, parking and any site-specific exception with Planning.
The City defines a change of use as a commercial space moving from one classification to another. Its review can involve a development permit and a Safety Codes building permit even where the lease describes the premises as ready.
The City's published process separates development review from building-safety review and can circulate a project for utilities, access, pedestrian connections and landscaping. Verify complete application requirements and current timing directly for the project.
Obtain title, zoning, permit and inspection records, then compare the intended use with the existing building. A current business operation or prior occupancy does not prove that a new operator has the same approval path.
Primary municipal sources
Editorial owner: Commercially Research & Editorial
Commercial review: Slav Loban
Review and corrections standard →Act on the market
Submit a development land requirement for Red Deer. The buyer link carries this market and originating page into the editable form. Owners can separately request a confidential property review.
Submit a requirement Discuss a property